Skip to content

Assemble and mount ​

Check that each mechanism moves through its full range and remains seated during manipulation.

Before assembly ​

Inspect all printed parts for:

  • warped mounting faces;
  • incomplete threads;
  • support material inside holes or tracks;
  • cracks around thin mechanisms; and
  • loose press-fit interfaces.

Replace damaged functional parts rather than forcing them into place.

Assemble the base ​

  1. Place the honeycomb base on a flat surface.
  2. Check that all seven cells are clear and dimensionally consistent.
  3. Insert one attachment base and press evenly until it is fully seated.
  4. Remove and reinsert the test attachment to confirm repeatable fit.
  5. Repeat the seating check across the cells you intend to use.

Assemble the mechanisms ​

The repository groups all parts required by each attachment in a dedicated STL folder. Keep the printed components from each folder together during assembly.

Threaded parts ​

Engage the part by hand without axial forcing. It should advance smoothly while remaining constrained by the thread. If it binds, remove debris and test the matching calibration piece before sanding the final component.

Ball valve and friction rings ​

Assemble the ball valve without a ring first. The ring configuration is evaluated as a separate condition and should only be fitted for the corresponding trial block.

For controller development, the 360° variant permits continued lever rotation beyond 90°. Check a full revolution by hand and keep the swept path clear. Record the variant and any ring in the setup description. The quarter-turn task target remains unchanged.

Button ​

Confirm that the cover opens freely and that the button returns after it is pressed. Both stages must remain visually distinguishable.

Drawer ​

Check the full pull-and-push travel. The drawer must not disengage unintentionally from its base during normal use.

Lock and key ​

Check insertion and rotation manually. The initial key position must be repeatable across trials.

Shock absorber ​

Confirm that the loose part of the shock absorber can be grasped, aligned with the pin, and fully inserted onto it. This attachment occupies two adjacent cells; reserve both before arranging the board.

Optional ArUco cell ​

The ArUco cells provide camera-visible references for board localization. IDs 0 and 1 share the same mounting geometry. Use a unique ID for each cell in view. Fit the black insert into the white base and optionally glue the mating surfaces. Mount it in an available cell with a clear camera view, leaving the task cells and robot approach unobstructed. Record its position and orientation relative to the board.

Mount the board ​

Fix the base to a rigid surface within the platform's working volume. Horizontal tabletop and vertical fixture mounting are both allowed, but the orientation must be reported because it changes the approach direction and the likelihood of an attachment releasing from its cell.

Before recorded trials:

  1. fully seat every attachment;
  2. confirm that all attachments are reachable without moving the base during a trial;
  3. check for collision risks around the fixture;
  4. photograph the setup as setup.jpg; and
  5. describe the mounting orientation in platform.md.

Dynamic loading

High-gain or jittering commands can damage printed mechanisms or loosen press-fit attachments. Inspect the board before every session and after any contact that visibly displaces an attachment.

Continue with the evaluation protocol.

HiveBoard documentation